Browse

SET Facilities (fully or partially suitable for model validation)

RelevanceRel. CCVM SET Facility Description
100% 10.1   ACHILLES Reflood Loop [10.1] Description
100% 7.1   BCN Boiloff/Reflood Tests (36 rods) [7.1] Description
100% 3.13   ERSEC Rod Bundle [3.13] Description
100% 6.8   ESTA (Eighteen Degree Sector Test Apparatus) Toshiba [6.8] Description
100% 6.9   ESTA-KP (KWU/PWR) Toshiba [6.9] Description
100% 11.23   FLECHT SEASET Westinghouse [11.23] Description
100% 5.6   Gen 3x3 (Steam Generator), SIET [5.6] Description
100% 9.1   NEPTUN-I Boiloff [9.1] Description
100% 9.2   NEPTUN-I and NEPTUN-II Reflood [9.2] Description
100% 3.15   OMEGA Rod Bundle [3.15] Description
100% 3.10   PATRICIA GV 1 [3.10] Description
100% 3.9   PERICLES Cylindrical [3.9] Description
100% 3.8   PERICLES Rectangular [3.8] Description
100% 3.19   PIERO (Air/Water) [3.19] Description
100% 2.2   REWET-II [2.2] Description
100% 6.14   SCTF, JAERI [6.14] Description
100% 6.5   SG U-Tube Test Facilitv JAERl [6.5] Description
100% 8.5   SlV [8.5] Description
100% 10.2   THETIS Bundle [10.2] Description
100% 11.38   THTF/ORNL [11.38] Description
100% 6.1   TPTF, JAERI [6.1] Description
100% 4.12   Thermalhyd. UP-BBR RS 373 [4.12] Description
100% 11.51   UCB CCFL [11.51] Description
100% 4.1   UPTF [4.1] Description
50% 5.7   8x8 Bundle, CISE [5.7] Description
50% 10.16   Crossflow Two-Phase Wind Tunnel [10.16] Description
50% 3.7   DADINE (Vertical Tube, Inside) [3.7] Description
50% 11.44   LS/GE Level Swell in Blowdown [11.44] Description
50% 10.32   Low Pressure Boiling Fac. (Harwell) [10.32] Description
50% 11.52   MB-2 SG Transient/Westinghouse [11.52] Description
50% 6.7   SRTF (Reflood), Toshiba [6.7] Description
50% 6.6   Single Pin Heat Transf.TF, JAERI [6.6] Description
50% 11.17   TUBE + CHANNEL DART Air/Water [11.17] Description

CFD Facilities (fully or partially suitable for model validation)

No CFD facilities